Write requirements around user outcomes, not just screens. Define roles, end-to-end workflows, integrations, acceptance criteria, and exclusions; use AI for a first draft, then have product and engineering owners verify business rules and technical assumptions.
What makes an app requirements document estimable?
Developers can estimate an app when its requirements describe who does what, how the system responds, what happens when things fail, and how completion will be accepted. Start with user outcomes and workflows, then document roles, integrations, constraints, exclusions, and decision ownership.
A list of screens is not enough. A screen name rarely tells an engineering team what data it reads, what actions it permits, what happens when a request fails, or whether the same task must work offline. Those unanswered questions become assumptions in an estimate. If different developers make different assumptions, their quotes are not comparing the same scope.
An estimation-ready document is not a technical design mandate. You do not need to choose the database, prescribe every architectural pattern, or specify implementation details before talking to developers. You do need to make product behavior and boundaries clear enough that a team can identify the work, surface uncertainty, and explain what its estimate includes.
That distinction matters when you are choosing a partner or planning an initial release. A detailed-looking document can still be hard to estimate if it leaves operational decisions unresolved. A shorter specification can be useful when it makes the important decisions explicit and gives engineers a way to mark unknowns rather than silently filling them in.
The goal is not to eliminate every question before estimation. The goal is to separate decisions already made from assumptions that need validation, so you can see what is firm, what is risky, and what could change the scope.
What should you decide before writing requirements?
Before writing requirements, identify the business outcome, primary user, launch boundary, and decision-maker for product questions. These anchors help you distinguish essential behavior from ideas that should wait.
Begin with a concise product brief. Describe the problem the app addresses, who experiences it, and what the user should be able to accomplish. Keep the outcome concrete. “Help customers manage bookings” is a starting point, but it is not yet enough to estimate. You still need to define how a booking is created, changed, confirmed, and handled when availability changes.
Write down the assumptions behind the product idea. For example, you might be assuming users have an account before they can book, that one person can manage multiple locations, or that a payment provider will confirm a transaction immediately. Mark each assumption as confirmed, unconfirmed, or intentionally deferred. This makes uncertainty visible without pretending every open question is a requirement.
Name the person who can resolve product decisions. If several stakeholders can give conflicting instructions, developers may pause work or implement the wrong interpretation. The decision-maker does not need to author every detail, but must be empowered to approve behavior, settle trade-offs, and accept changes to scope.
Separate the goal from the proposed solution
A business goal describes the user or operational result; a solution describes one possible way to achieve it. Keeping the two separate gives developers room to identify simpler implementation options without changing the intended outcome.
For instance, “reduce missed appointments” is a goal. Sending a reminder notification is a proposed solution. If reminders are part of the launch scope, specify who receives them, when they are triggered, what happens if delivery fails, and whether users can change their preferences. If you have not decided whether reminders are essential, label the feature as a candidate rather than letting it enter the estimate as an assumed commitment.
This separation is especially useful when stakeholders propose screens or features before validating the underlying need. A document can preserve the goal while recording the proposed feature as one option. That avoids treating an early idea as a locked implementation requirement.
Define the launch boundary
State what the first release must enable and which user groups it must serve. A product can have a broad long-term vision while still having a narrow, testable initial release.
Do not describe a feature as “basic” or “simple” without defining its behavior. A basic profile might include viewing and editing contact information, but not identity verification, profile visibility controls, or account merging. If those distinctions matter, write them down.
A launch boundary should also name the devices and operating environments that matter to your audience. If the app must support phones and tablets, work in landscape orientation, meet accessibility needs, or run on older operating system versions, state that expectation. If a particular device context is not supported, state the exclusion. Leaving platform assumptions unstated can make proposals difficult to compare.
How do you document user roles and permissions?
Document each user role by listing its purpose, registration path, accessible information, permitted actions, and restrictions. Roles are not labels alone; each one changes the app’s behavior and access rules.
Start with the people who use or administer the product. A service app might have customers, service providers, and administrators. A workplace app might have employees, managers, and account owners. Use the roles that fit your product, and do not create separate roles merely because two users have different job titles. Create a role when permissions, visibility, or workflows differ.
For every role, answer these questions:
- How does the person get an account?
- Can they sign up themselves, or must someone invite or approve them?
- What credentials or identity checks are required?
- Which screens and records can they see?
- Which actions can they take?
- Can they edit or delete information created by another user?
- What happens when their account is suspended, removed, or transferred?
- How can they recover access?
- Who can manage their permissions?
A role matrix makes differences visible. Keep it tied to actual product behavior rather than documenting abstract access levels.
| Capability | Customer | Provider | Administrator |
|---|---|---|---|
| View own profile | Allowed | Allowed | Allowed |
| View other users’ private details | Not allowed | Only where needed for an assigned task | Restricted to an approved operational purpose |
| Create a service request | Allowed | Not allowed | Only if required for support |
| Update request status | Not allowed | Only for assigned requests | Allowed for defined support cases |
| Suspend an account | Not allowed | Not allowed | Allowed with a recorded reason |
This table is an illustration, not a default policy. Replace each entry with a product decision. “Administrator can access everything” is usually too broad to be useful. Specify whether staff can view sensitive records, change financial state, impersonate a user, or export data, and identify any audit trail or approval requirement.
Describe account lifecycle, not only signup
Account requirements include what happens before and after registration. A complete description covers invitation, verification, failed login, recovery, account changes, suspension, deletion, and reactivation where those states apply.
Consider a user who changes their email address. Does the change take effect immediately, require confirmation, or need administrator approval? If an organization owns the account, who retains access when an employee leaves? If users can request account deletion, what happens to records that must remain available for an operational or legal reason? These are product and policy choices, not details an engineer should invent.
Avoid writing “support login” as if all login flows behave alike. Name the accepted sign-in methods and describe recovery. If a third-party identity provider is involved, state whether the account can exist without it, what happens when its service is unavailable, and which account information the app relies on.
Keep authorization distinct from screen visibility
A button hidden in the interface is not, by itself, a permission rule. State which actions the system must permit or reject, including requests made outside the visible screen when that distinction matters to your product.
For example, a provider may see only jobs assigned to them. That rule should apply to the underlying data access, not merely to the list displayed in the app. Document the intended access boundary, any exceptions, and which role can grant or revoke access. A developer can then estimate the screens and the supporting authorization behavior as connected pieces of work.
How should you write workflows and failure states?
Write each core workflow as a sequence of user actions and system responses, including the successful outcome, validation, interruptions, and recovery path. A workflow should make it possible to follow the user’s goal from start to finish without guessing what the app does between screens.
Use a repeatable structure:
- Starting state: What must be true before the user begins?
- User action: What does the person enter, select, upload, or confirm?
- System response: What does the app display, save, send, or calculate?
- Decision point: What conditions change the next step?
- Failure behavior: What does the user see if an operation cannot complete?
- Recovery: Can the user retry, edit, cancel, or contact support?
- Completion: What observable result means the workflow succeeded?
Consider a booking flow. “User books an appointment” leaves the critical behavior undefined. A more useful requirement says the user selects a service and an available time, reviews the booking details, confirms the request, and receives a clear status. It then specifies whether the booking is immediately confirmed or awaits provider approval, how the app responds if the chosen time is no longer available, and what the user can do after a failed submission.
Do not write a screenplay for every tap. Focus on transitions that affect business rules, data, access, money, external services, or user expectations. For routine interface behavior, a clear design prototype can carry visual details while the requirements document captures the rules that cannot be inferred from appearance.
Make the happy path testable
The happy path is the normal sequence from a valid starting state to a successful result. Describe it with enough specificity that someone can test it without asking what “done” means.
Include inputs that affect the result. If a user submits a request, identify the required fields, accepted formats, default values, and any conditions that determine availability. If the system calculates a fee or status, explain which product rule governs it. When a rule has not been decided, mark it as an open question; do not hide it in a vague sentence.
A workflow can be represented in prose, a diagram, or a table. Choose the form that makes branching easiest to review. A table is useful when several outcomes depend on the same user action:
| User action or condition | System response | User’s next option |
|---|---|---|
| Required information is missing | Identify the field that needs attention and retain valid entries | Correct the information |
| Submission succeeds | Show the resulting status and confirmation | View the request |
| The request cannot be submitted | Explain that no submission was completed | Retry or leave the flow |
| Availability changes before confirmation | Explain that the selected option is no longer available | Choose another option |
These outcomes need product-specific wording and data behavior. For instance, decide whether a failed request is retained as a draft and whether a retry could create a duplicate. The table helps expose the question; it does not answer it on behalf of the product owner.
Specify failure and recovery behavior
Failure requirements should tell the developer what the user sees and what state the app keeps. “Show an error” is not enough because an error message can leave the user unsure whether a payment, upload, or request actually completed.
For each important operation, identify likely failure categories. A request might fail because input is invalid, the network is unavailable, a service rejects the request, a user lacks permission, or the server cannot confirm the result. Decide whether the app should preserve entered data, offer a retry, display a pending state, or direct the user to another route.
Be especially precise when the outcome is uncertain. If a connection drops after the user confirms a purchase, the app may not know whether the external service processed it. The requirement should say how the app checks the status before inviting another submission. Otherwise, a user may repeat the action and create a duplicate.
Distinguish recoverable problems from terminal ones. A correctable form error should point to the field that needs attention. An expired session may require sign-in before the user resumes. An account restriction may need support intervention. Use language that helps the person understand what happened without promising a result the system cannot verify.
Decide what happens offline and during conflicts
Offline behavior is a product decision whenever a user might lose connectivity during a core task. Specify whether the app blocks the action, saves a local draft, queues work for later, or allows read-only access.
“Works offline” is too broad to estimate. A field worker may need to view assigned records in an area without service, but an action that changes inventory or claims a shared resource may need a live server check. Describe which data can be cached, whether cached information can be edited, when pending changes sync, and what the user sees while a change is waiting.
If two people can update or claim the same item, define the conflict rule. The system might accept the first confirmed action, allow an administrator to resolve the conflict, or show an updated availability state and ask the second user to choose again. Also define whether an earlier edit can overwrite newer information. These choices shape data behavior and user feedback, so leaving them implicit makes estimates less reliable.
What integration details should go into the document?
For every external integration, identify the service, the data and actions involved, the account owner, the environment, and what the app should do when the service is unavailable. Naming a vendor without describing the interaction leaves major technical and operational questions open.
List integrations by capability: authentication, payments, mapping, notifications, analytics, file storage, identity checks, external databases, or other services relevant to the product. For each one, document:
- The intended provider, if selected, or the required capability if not.
- The reason the integration is needed.
- What information is sent to and received from it.
- Which side owns the authoritative record.
- When the app calls the service and what triggers the call.
- Whether the integration must support a test or sandbox environment.
- Who controls the account and credentials.
- What documentation or vendor approval is required.
- How failures, delays, retries, and duplicate messages should be handled.
- Any known limits imposed by the selected plan or account.
This detail helps separate the app work from provider setup. A payment feature can include a user interface, server-side transaction handling, payment status updates, refunds, and operational reconciliation. “Add payments” does not say which of those behaviors are in scope.
Include event and data boundaries
Describe the events that cause information to move between systems and the records that must stay consistent. An integration is not only a button that opens a vendor service. It may involve asynchronous updates, notifications, retries, and reconciliation when systems disagree.
For a payment workflow, decide what status the app displays while confirmation is pending, which service is the source of truth for the transaction, and how the app learns about a later status change. For a mapping flow, specify whether location is used only to show a map or also to determine eligibility, calculate a route, or share live position. For notifications, identify the event that triggers a message and whether the user can opt out.
Avoid specifying private credentials in the requirements document. State who owns the provider account and how authorized engineers will receive access through an appropriate, secure process. Make clear whether the account already exists, needs configuration, or depends on vendor review. Credentials, production access, and account permissions can affect a project’s readiness even when the desired app behavior is clear.
Call out vendor and platform constraints
Record known restrictions instead of assuming that an API behaves the same in every account tier or environment. If a provider’s sandbox differs from production, note what must be verified before launch. If the provider uses callbacks or webhooks, identify expected behavior when delivery is delayed or repeated.
Do not invent restrictions to fill an empty section. Ask the vendor or technical owner to confirm the details, and mark unverified items as dependencies. The estimate should distinguish known integration work from investigation required to validate a provider’s capabilities.
Mobile operating systems also impose constraints on background activity, notifications, location, and data access. Describe the user-facing requirement and the circumstances in which it must work. Let the engineering team propose an implementation that conforms to current platform behavior, then validate that proposal against your product’s operational needs. This is more useful than prescribing a mechanism before the relevant conditions are understood.
How do acceptance criteria make an estimate useful?
Acceptance criteria define observable evidence that a requirement is complete. They help a development team estimate verification work and give stakeholders a consistent basis for reviewing the delivered behavior.
Write each criterion so that a tester can decide whether it passes. “The app is easy to use” expresses an aspiration, not an acceptance condition. “A user can submit a valid request, see its resulting status, and reopen it from their account” is closer, but still needs product-specific rules for invalid input, permissions, and failure.
A strong acceptance criterion includes the starting conditions, action, and expected result. For example:
- Given a user has permission to create a request, when they submit all required information successfully, then the app displays the created request and its current status.
- Given a required field is missing, when the user attempts submission, then the app identifies the field and does not submit an incomplete request.
- Given the service cannot confirm whether a request was created, when the response is received, then the app shows a pending or unresolved state instead of claiming success.
The exact behavior is yours to decide. These examples show the structure, not universal product rules.
Name the environments and devices used for acceptance
State where a feature must be verified and what device contexts matter. A workflow that works in a simulator but fails on the target device is not accepted if the product depends on device hardware or real-world connectivity.
Identify the supported mobile platforms, relevant operating system versions, form factors, and any device capabilities required by the product. If the app uses Bluetooth Low Energy, camera access, location, or background notifications, describe the user journey that must be exercised on a physical device. Define any conditions that are out of scope, such as unsupported hardware or a particular operating context.
Acceptance also needs a test-data plan. Specify whether reviewers can use a test account, what sample states should be available, and whether an integration has a sandbox suitable for verification. Avoid using real customer data in informal acceptance testing. Decide who can access test accounts and who is responsible for resetting or maintaining them.
Separate acceptance from subjective review
Some decisions involve judgment, such as whether a layout feels clear or a visual treatment fits the brand. Keep those review points, but do not make them the only definition of completion.
For design-sensitive work, identify the approved design or prototype and name the stakeholder responsible for sign-off. For functional behavior, use explicit criteria. For content, specify who supplies text and who approves it. For accessibility expectations, describe the relevant product requirements rather than assuming visual approval covers them.
Define how changes to approved behavior are handled. A new requirement discovered during review may be valuable, but it should be recorded as a change to scope rather than treated as an unnoticed correction. This protects both the schedule discussion and the product decision from ambiguous acceptance debates.
Assign approval authority
Name who can approve designs, requirements, and completed work, and who resolves conflicting feedback. Multiple reviewers can contribute, but one accountable decision-maker should settle disagreements for each area.
Set expectations for how the product owner reports a defect, clarifies a requirement, or requests a change. This does not need a complicated governance process. It does need to prevent a developer from receiving incompatible instructions from separate stakeholders with no way to determine which one is authoritative.
Why are exclusions essential to a useful estimate?
Exclusions define what the initial release will not include, which prevents developers from estimating an imagined version of the product. A feature backlog says what may be built; an exclusion list makes the current boundary explicit.
Write exclusions as concrete capabilities, not loose statements such as “advanced features later.” For example, if a first release supports account creation but not organization-level account management, say so. If users can receive a status notification but cannot configure notification rules, document that boundary. If an administrator can update a record but cannot export reports, list the export as excluded.
Add a short reason when it helps future decisions. A capability might be postponed because it is not needed to validate the central workflow, depends on a policy decision, or requires an integration that is not ready. The reason makes the exclusion less likely to be misread as accidental omission.
Be careful with words such as “later,” “phase two,” or “future-ready.” They can imply that a developer should build extensibility or supporting infrastructure now. If a future capability should not affect the current implementation, state that clearly. If the current design must preserve a known extension point, describe the constraint and ask the technical team to explain its effect on scope.
A useful exclusion list also identifies what is not included in project delivery, where relevant. Examples may include supplying final copy, preparing vendor accounts, migrating historical data, creating an operations policy, or producing a marketing website. Do not assume these items belong in or out of a proposal. Make the responsibility explicit so both sides can compare estimates against the same delivery boundary.
For help deciding which capabilities belong in an initial product, AI MVP feature prioritization discusses how to distinguish launch needs from ideas that can wait.
How can AI help draft requirements, and where must people review?
AI can turn rough product notes into a structured first draft, but a founder or technical owner must verify every business rule, integration assumption, and launch decision before treating that draft as scope. Use AI to improve coverage and organization, not to make product commitments.
A useful drafting task gives the model context, constraints, and a defined output. You might provide a workflow description and ask for a list of user roles, success states, failure states, open questions, and candidate acceptance criteria. Ask the tool to label assumptions separately from confirmed decisions. That prompt makes it easier to review what the model has added rather than allowing plausible suggestions to blend into approved scope.
AI can help with work such as:
- Converting unstructured interview notes into a consistent requirement format.
- Turning a described workflow into draft user stories and acceptance criteria.
- Suggesting common validation and recovery questions for forms or account access.
- Identifying terms that are used inconsistently across the document.
- Finding requirements that lack an actor, outcome, or observable completion condition.
- Creating a checklist of questions to take to a provider or engineering team.
Treat the result as an editing aid. A model can produce fluent requirements that do not reflect how your business actually operates. It may assume a conventional approval flow, invent an integration capability, or suggest a broader feature set than the product needs. A well-formatted draft can therefore appear more settled than it is.
Review operational rules with the people who own them
AI cannot determine your organization’s refund policy, service commitments, fulfillment limits, or escalation authority unless those facts have been supplied and verified. Ask the responsible people to confirm rules that affect money, legal obligations, customer support, inventory, safety, or access to sensitive information.
A practical review is to take each generated requirement and classify it as one of the following:
- Confirmed: The responsible owner has approved the behavior.
- Open decision: A named person still needs to decide.
- Technical assumption: Engineering must validate feasibility or implementation implications.
- Out of scope: The capability is intentionally excluded from the current release.
This classification turns a polished draft into a decision tool. It also helps prevent a model’s examples from being mistaken for product policy.
Validate integration claims against providers
Do not accept an AI-generated statement about API availability, account limits, background behavior, or sandbox support without checking the current provider documentation and account terms. Vendor behavior can vary with configuration, account level, product changes, and the way your app uses the service.
Ask the engineering team to identify the unresolved integration questions before providing a firm scope. If a provider has not been selected, compare candidates against the required behavior instead of letting an AI-generated vendor name decide the architecture. If a provider has been chosen, verify that it supports the workflow, data handling, and failure behavior the product requires.
AI is especially useful for creating a vendor-question checklist. It is not a substitute for a vendor answer or an engineering review. This is also where a human can catch a mismatch between the desired experience and the actual limits of the mobile platform.
Review scope for unnecessary expansion
AI tools commonly suggest extra features because they make a specification seem comprehensive. A generated list may add analytics dashboards, referral flows, advanced settings, or multiple account types even when those features are not needed for the launch goal.
For each suggested capability, ask whether the core user can complete the launch workflow without it. If the answer is yes, consider moving it to a later list or excluding it. If the feature is essential because of a business rule, name that rule. The decision should come from product priorities and operational needs, not from the number of suggestions a drafting tool can produce.
When the app includes AI behavior, requirements need to cover the AI interaction itself, not just the surrounding screens. Specify inputs, user-facing outcomes, error handling, review or override expectations, and the data the system may use. For a practical view of document intake workflows, see AI Document Processing Apps: From Upload to Useful Data. For broader AI readiness, How to Test an AI Mobile App Before Launch covers validation concerns that conventional screen acceptance criteria may not capture.
How do you turn an early document into a comparable estimate?
Ask each development team to estimate the same approved scope, state its assumptions, and separate confirmed work from investigation or unresolved dependencies. A useful estimate makes uncertainty visible instead of hiding it inside a single total.
Before requesting proposals, review the document for gaps that change implementation effort. Check whether it names user roles, primary workflows, failure states, integrations, platform expectations, acceptance conditions, exclusions, and decision owners. If a requirement is unclear, ask the team to record its interpretation and the effect of that assumption rather than silently choosing one.
Give each team the same supporting materials, such as approved designs, integration documentation, product rules, and the current list of open questions. Make clear which material is final and which is illustrative. If a prototype shows a screen but not its behavior, say so. If sample data is representative rather than authoritative, label it.
Request an estimate that distinguishes:
- Work included in the proposed scope.
- Assumptions the estimate relies on.
- External dependencies the team does not control.
- Questions that need a product decision.
- Discovery or validation work required before committing to implementation.
- Exclusions and any options that should be priced or planned separately.
This makes estimates easier to compare. A lower estimate may reflect a narrower interpretation, fewer failure cases, or omitted integration work rather than a more efficient implementation. Ask the provider to map its proposal back to the requirements so differences are visible.
The estimate will change when the scope changes, a critical assumption proves false, or a dependency behaves differently than expected. That does not mean the document failed. The document has done its job if it helps you see which decision or discovery item causes the change and gives everyone a clear way to update scope.
For guidance on the cost factors that influence a mobile project, read How Much Does It Cost to Build a Mobile App in 2026?. Use those considerations to prepare questions, then get a project-specific estimate against your defined workflows and boundaries rather than relying on a generic figure.
What should a founder checklist include?
A founder checklist should confirm that every major estimate driver has an owner, a defined behavior, and a way to verify completion. Use it before sharing the document with developers and revisit it when stakeholders make decisions.
Product and launch boundary
- Can you state the user problem and intended outcome without prescribing a screen as the only solution?
- Have you identified the primary user and any other roles that change access or workflows?
- Is the initial release boundary clear?
- Are proposed features distinguishable from approved requirements?
- Does every deferred capability appear in the exclusions list?
- Have you identified who can approve a change to scope?
Roles and permissions
- Is every role described by its purpose and account lifecycle?
- Do you know what each role can view, create, change, approve, and remove?
- Are administrative powers limited to named operational needs?
- Is account recovery defined?
- Have you decided how invitation, suspension, deletion, and reactivation work where relevant?
- Are access rules described as system behavior rather than only as screen visibility?
Workflows and states
- Does each core user journey have a clear start and successful end?
- Are the user’s inputs and system responses described in sequence?
- Are validation rules explicit?
- Do failure states explain what the user sees and what happens to entered data?
- Is the behavior clear when an outcome cannot be confirmed?
- Are retries protected from duplicate actions where needed?
- Have you decided which tasks work offline and how changes sync?
- Are conflicts between simultaneous users handled deliberately?
Integrations and dependencies
- Is each provider or required integration capability named?
- Is the data exchanged and its source of truth clear?
- Are triggers, delayed responses, retries, and duplicate events considered?
- Do you know whether the relevant test environment supports the required workflow?
- Is account ownership clear?
- Are provider access and technical documentation ready for review?
- Are unverified vendor constraints recorded as open questions rather than assumptions?
Acceptance and governance
- Can a tester tell whether each requirement passes?
- Are the target platforms, device contexts, and hardware-dependent workflows defined?
- Is there a plan for test accounts and representative data?
- Are visual approval and functional acceptance distinguished?
- Is the approving stakeholder named?
- Is there a clear way to report defects and request scope changes?
A blank answer is not a reason to invent a requirement. Mark it as an open decision, assign an owner, and decide whether it must be resolved before estimation or can remain an explicit assumption in the proposal.
Conclusion
An estimable app requirements document describes user outcomes, roles, workflows, integrations, acceptance criteria, and exclusions in enough detail to reveal both scope and uncertainty. Use AI to organize and challenge a draft, but have product owners and engineers verify its rules and technical assumptions. When estimates differ, compare their assumptions against the same documented boundary.
Next Steps
If you are preparing an app for development, tell us about your project to get a review of your workflows, integration dependencies, and open scope decisions. See what Rapid MVP Development covers and use that discussion to prepare for a more grounded estimate.
Frequently Asked Questions
What should an app requirements document include?
Include the product outcome, user roles and permissions, core workflows, failure and offline behavior, integrations, acceptance criteria, exclusions, and decision ownership. Mark unresolved questions as open rather than presenting assumptions as confirmed requirements.
How detailed should mobile app requirements be?
Requirements should be detailed enough for developers to identify the work and explain their assumptions, but they do not need to dictate architecture. Describe observable behavior, rules, dependencies, and acceptance conditions; let the engineering team propose the implementation.
Can AI write app requirements for me?
AI can organize product notes, suggest workflow edge cases, and draft acceptance criteria. A product owner and technical reviewer must verify business policies, provider behavior, platform constraints, and what belongs in the launch scope.
Why do developers need exclusions in a requirements document?
Exclusions show which capabilities are intentionally outside the current scope. Without them, different developers may estimate different versions of the product, making their proposals difficult to compare.
How do I compare estimates from different app developers?
Give each developer the same requirements and supporting materials, then compare scope, assumptions, dependencies, investigation work, and exclusions. Ask each team to explain how its estimate maps to the documented workflows and acceptance criteria.